An exact method for the analysis of a two-machine manufacturing system with a finite buffer subject to time-dependent failure
From MaRDI portal
Publication:1666925
DOI10.1155/2015/916193zbMath1394.90240OpenAlexW2113933624WikidataQ59120262 ScholiaQ59120262MaRDI QIDQ1666925
Jianping Chen, Beixin Xia, Zaifang Zhang
Publication date: 27 August 2018
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2015/916193
Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30)
Cites Work
- Unnamed Item
- Discrete time model for two-machine one-buffer transfer lines with restart policy
- The two-machine one-buffer continuous time model with restart policy
- A continuous materials flow production line model with station breakdown
- Manufacturing flow line systems: A review of models and analytical results
- Modelling and analysis of Markovian continuous flow systems with a finite buffer
- Approximate analysis of transfer lines with unreliable machines and finite buffers
- Development of a model for a two-station serial transfer line subject to machine and buffer failure
- A station model for continuous materials flow production systems
- An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers
- Steady-state performance analysis of serial transfer lines subject to machine and buffer failure
- Finite Queues in Series with Exponential or Erlang Service Times—A Numerical Approach
This page was built for publication: An exact method for the analysis of a two-machine manufacturing system with a finite buffer subject to time-dependent failure