A biased random-key genetic algorithm for the project scheduling problem with flexible resources
From MaRDI portal
Publication:1667401
DOI10.1007/S11750-018-0472-9zbMath1394.90261OpenAlexW2800301514MaRDI QIDQ1667401
Bernardo F. Almeida, Francisco Saldanha-Da-gama, Isabel H. Correia
Publication date: 28 August 2018
Published in: Top (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11750-018-0472-9
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (7)
Heuristic and metaheuristic methods for the multi‐skill project scheduling problem with partial preemption ⋮ Hybrid metaheuristics to solve a multiproduct two‐stage capacitated facility location problem ⋮ On the complexity of efficient multi-skilled team composition ⋮ Tabu search for proactive project scheduling problem with flexible resources ⋮ Multi-project scheduling problem under shared multi-skill resource constraints ⋮ An updated survey of variants and extensions of the resource-constrained project scheduling problem ⋮ A new algorithm for resource-constrained project scheduling with breadth and depth of skills
Cites Work
- A biased random-key genetic algorithm for the unequal area facility layout problem
- A biased random-key genetic algorithm for the capacitated minimum spanning tree problem
- Project scheduling with flexible resources: formulation and inequalities
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- A random key based genetic algorithm for the resource constrained project scheduling problem
- Competence-driven project portfolio selection, scheduling and staff assignment
- A survey of variants and extensions of the resource-constrained project scheduling problem
- An iterative scheduling technique for resource-constrained project scheduling
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Resource-constrained project scheduling: A survey of recent developments.
- Project scheduling. A research handbook.
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- Minimizing average project team size given multi-skilled workers with heterogeneous skill levels
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects
- Scheduling projects with multi-skilled personnel by a hybrid MILP/CP Benders decomposition algorithm
- Scheduling and staffing multiple projects with a multi-skilled workforce
- A genetic algorithm for the resource constrained multi-project scheduling problem
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- A self-adapting genetic algorithm for project scheduling under resource constraints
- A robust genetic algorithm for resource allocation in project scheduling
- Unnamed Item
This page was built for publication: A biased random-key genetic algorithm for the project scheduling problem with flexible resources