Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system
DOI10.1016/j.apm.2012.10.024zbMath1426.90132OpenAlexW2006004042MaRDI QIDQ1667804
Reza Ramezanian, Mohammad Saidi-Mehrabad
Publication date: 30 August 2018
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2012.10.024
Taguchi methodflow shopsequence-dependent setuphybrid meta-heuristicMIP-based heuristicstochastic lot-sizing and scheduling
Stochastic programming (90C15) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30)
Related Items (12)
Cites Work
- Unnamed Item
- Unnamed Item
- Optimization by Simulated Annealing
- Sample average approximation method for chance constrained programming: Theory and applications
- Multi-level, single-machine lot sizing and scheduling (with initial inventory)
- Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system
- Theory and practice of uncertain programming.
- Dynamic capacitated lot-sizing problems: a classification and review of solution approaches
- Feasibility and infeasibility in optimization. Algorithms and computational methods.
- Fix and relax heuristic for a stochastic lot-sizing problem
- Dynamic Version of the Economic Lot Size Model
- Some insights into proportional lot sizing and scheduling
- Minimizing the Expected Makespan in Stochastic Flow Shops
- An Integrated Model for Job-Shop Planning and Scheduling
- Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups
- Rolling-horizon lot-sizing when set-up times are sequence-dependent
- Equation of State Calculations by Fast Computing Machines
This page was built for publication: Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system