An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case
From MaRDI portal
Publication:1681264
DOI10.1016/j.ejor.2017.07.027zbMath1374.90158OpenAlexW2735745260MaRDI QIDQ1681264
Roubila Lilia Kadri, Fayez F. Boctor
Publication date: 23 November 2017
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2017.07.027
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (8)
An evolutionary approach for resource constrained project scheduling with uncertain changes ⋮ Dynamic resource allocation and collaborative scheduling in R\&D and manufacturing processes of high-end equipment with budget constraint ⋮ A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times ⋮ Design of computational intelligent procedure for thermal analysis of porous fin model ⋮ An updated survey of variants and extensions of the resource-constrained project scheduling problem ⋮ A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing ⋮ An efficient genetic algorithm for decentralized multi-project scheduling with resource transfers ⋮ A tree search heuristic for the resource constrained project scheduling problem with transfer times
Cites Work
- A flow-based tabu search algorithm for the RCPSP with transfer times
- A population-based approach to the resource-constrained project scheduling problem
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
- A random key based genetic algorithm for the resource constrained project scheduling problem
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
- Scheduling subject to resource constraints: Classification and complexity
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem
- A branch and bound algorithm for the resource-constrained project scheduling problem
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
- Une méthode arborescente pour résoudre les problèmes cumulatifs
- Resource-constrained project scheduling by simulated annealing
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms
- A self-adapting genetic algorithm for project scheduling under resource constraints
- Project scheduling with multiple modes: A genetic algorithm
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case