A two-stage stochastic programming approach for multi-activity tour scheduling
From MaRDI portal
Publication:1683088
DOI10.1016/j.ejor.2017.04.055zbMath1375.90142OpenAlexW2608685850MaRDI QIDQ1683088
Bernard Gendron, Louis-Martin Rousseau, Maria I. Restrepo
Publication date: 6 December 2017
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2017.04.055
schedulingcontext-free grammarsL-shaped methodstochastic multi-activity tour scheduling problemtwo-stage stochastic programming model
Related Items (4)
Multi-stage distributionally robust optimization with risk aversion ⋮ A new convergent hybrid learning algorithm for two-stage stochastic programs ⋮ A two-stage solution approach for personalized multi-department multi-day shift scheduling ⋮ Multiskilled personnel assignment problem under uncertain demand: a benchmarking analysis
Cites Work
- Simulation of nonhomogeneous poisson processes by thinning
- Workforce planning incorporating skills: state of the art
- A branch-and-price algorithm for the multi-activity multi-task shift scheduling problem
- A stochastic programming model for scheduling call centers with global service level agreements
- A \texttt{cost-regular} based hybrid column generation approach
- A large neighbourhood search approach to the multi-activity shift scheduling problem
- Practical enhancements to the Magnanti-Wong method
- Cut generation for an employee timetabling problem
- A multicut algorithm for two-stage stochastic linear programs
- Staff scheduling and rostering: a review of applications, methods and models.
- A distributed genetic algorithm for deterministic and stochastic labor scheduling problems
- An annotated bibliography of personnel scheduling and rostering
- Survey, categorization, and comparison of recent tour scheduling literature
- Personnel scheduling: a literature review
- Solving multi-activity multi-day shift scheduling problems with a hybrid heuristic
- Formal languages for integer programming modeling of shift scheduling problems
- Workforce planning at USPS mail processing and distribution centers using stochastic optimization
- A successive convex approximation method for multistage workforce capacity planning problem with turnover
- A Two-Stage Stochastic Integer Programming Approach to Integrated Staffing and Scheduling with Application to Nurse Management
- Grammar-Based Integer Programming Models for Multiactivity Shift Scheduling
- Two-stage workforce planning under demand fluctuations and uncertainty
- Decomposing Global Grammar Constraints
- Accelerating Benders Decomposition: Algorithmic Enhancement and Model Selection Criteria
- Maximizing Submodular Set Functions: Formulations and Analysis of Algorithms
- A Modified Benders' Partitioning Algorithm for Mixed Integer Programming
- Optimal Shift Scheduling with Multiple Break Windows
- L-Shaped Linear Programs with Applications to Optimal Control and Stochastic Programming
This page was built for publication: A two-stage stochastic programming approach for multi-activity tour scheduling