Energy efficient scheduling of open-pit coal mine trucks
From MaRDI portal
Publication:1683111
DOI10.1016/j.ejor.2017.03.081zbMath1375.90201MaRDI QIDQ1683111
Erhan Kozan, S. R. Patterson, P. Hyland
Publication date: 6 December 2017
Published in: European Journal of Operational Research (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Case-oriented studies in operations research (90B90)
Related Items (4)
A real-world mine excavators timetabling methodology in open-pit mining ⋮ An optimization model for the real-time truck dispatching problem in open-pit mining operations ⋮ OPTIMISING THE OPERATIONAL ENERGY EFFICIENCY OF AN OPEN-PIT COAL MINE SYSTEM ⋮ A new constraint programming approach for optimising a coal rail system
Cites Work
- Energy-efficient scheduling in manufacturing companies: a review and research framework
- Thirty years of heterogeneous vehicle routing
- Cable shovel digging optimization for energy efficiency
- A hybrid heuristic algorithm for the open-pit-mining operational planning problem
- Modelling and optimizing an open-pit truck scheduling problem
- A multi-objective decision model for investment in energy savings and emission reductions in coal mining
- A linear model for surface mining haul truck allocation incorporating shovel idle probabilities
- Modeling and solution of the joint quay crane and truck scheduling problem
- Tabu Search—Part I
- Scheduling
This page was built for publication: Energy efficient scheduling of open-pit coal mine trucks