Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
MaRDI portal item
Discussion
View source
View history
Purge
English
Log in

An optimization algorithm for integrated remanufacturing production planning and scheduling system

From MaRDI portal
Publication:1694535
Jump to:navigation, search

DOI10.1016/J.CHAOS.2017.10.012zbMath1380.90104OpenAlexW2765318042MaRDI QIDQ1694535

Haijun Wen, Yong-Jiang Liu, Shi-wang Hou, Zhao-Hua Liu

Publication date: 2 February 2018

Published in: Chaos, Solitons and Fractals (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.chaos.2017.10.012


zbMATH Keywords

schedulingproduction planningremanufacturinghybrid intelligent algorithmbirandom programing


Mathematics Subject Classification ID

Stochastic programming (90C15) Production models (90B30)





Cites Work

  • Unnamed Item
  • Bifurcation and chaos in a discrete physiological control system
  • Statistical physics of vaccination
  • Global dynamics of a predator-prey system modeling by metaphysiological approach
  • Assessing reappearance factors of H7N9 avian influenza in China
  • Transmission dynamics of cholera: mathematical modeling and control strategies
  • An Integrated Model for Job-Shop Planning and Scheduling
  • Solution Strategy of Integrated Optimization of Production Planning and Scheduling in a Flexible Job-shop




This page was built for publication: An optimization algorithm for integrated remanufacturing production planning and scheduling system

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1694535&oldid=14016253"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
This page was last edited on 1 February 2024, at 05:52.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki