Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility
From MaRDI portal
Publication:1698061
DOI10.1007/s10878-017-0155-8zbMath1393.90064OpenAlexW2736936875MaRDI QIDQ1698061
Publication date: 21 February 2018
Published in: Journal of Combinatorial Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10878-017-0155-8
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (2)
Predictive-reactive strategy for identical parallel machine rescheduling ⋮ Efficiency of the solution representations for the hybrid flow shop scheduling problem with makespan objective
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Scheduling algorithms for flexible flowshops: Worst and average case performance
- Operating room planning and scheduling: a literature review
- Some no-wait shops scheduling problems: Complexity aspect
- Performance of scheduling algorithms for no-wait flowshops with parallel machines
- Approximability of two-machine no-wait flowshop scheduling with availability constraints.
- Geometrical heuristics for multiprocessor flowshop scheduling with uniform machines at each stage
- Minimum deviation algorithm for two-stage no-wait flowshops with parallel machines
- The hybrid flow shop scheduling problem
- Two-Machine No-Wait Flow Shop Scheduling with Missing Operations
- Two-Stage, Hybrid Flowshop Scheduling Problem
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One Stage
- The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
- Batch scheduling in the no-wait two-machine flowshop to minimize the makespan
This page was built for publication: Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility