An uncertain furniture production planning problem with cumulative service levels
From MaRDI portal
Publication:1701616
DOI10.1007/s00500-015-1839-6zbMath1387.90080OpenAlexW1132466017MaRDI QIDQ1701616
Ruiqing Zhao, Wansheng Tang, Guo-Qing Yang
Publication date: 27 February 2018
Published in: Soft Computing (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00500-015-1839-6
loss aversionprospect theoryuncertainty theorychemical reaction optimizationcumulative service levelfurniture production planning
Cites Work
- Risk decision analysis in emergency response: a method based on cumulative prospect theory
- Service level robustness in stochastic production planning under random machine breakdowns
- Two-stage fuzzy production planning expected value model and its approximation method
- Optimal production planning for a multi-product closed loop system with uncertain demand and return
- An approximation-based approach for fuzzy multi-period production planning problem with credibility objective
- A coupling cutting stock-lot sizing problem in the paper industry
- Production planning in furniture settings via robust optimization
- Uncertain random variables: a mixture of uncertainty and randomness
- Modeling fuzzy multi-period production planning and sourcing problem with credibility service levels
- Pricing insurance contracts under cumulative prospect theory
- Risk-averse two-stage stochastic programs in furniture plants
- A multiperiod stochastic production planning and sourcing problem with service level constraints
- Portfolio Choice Under Cumulative Prospect Theory: An Analytical Treatment
- Robust Capacity Planning Under Uncertainty
- Prospect Theory: An Analysis of Decision under Risk
- Uncertainty theory
This page was built for publication: An uncertain furniture production planning problem with cumulative service levels