An efficient pseudo-polynomial algorithm for finding a lower bound on the makespan for the resource constrained project scheduling problem
From MaRDI portal
Publication:1711441
DOI10.1016/j.ejor.2018.11.005zbMath1430.90243OpenAlexW2900168008WikidataQ128909106 ScholiaQ128909106MaRDI QIDQ1711441
Olga Battaïa, Dmitry I. Arkhipov, Alexander A. Lazarev
Publication date: 18 January 2019
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: http://oatao.univ-toulouse.fr/21875/1/Arkhipov_21875..pdf
Related Items (1)
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- A note on two problems in connexion with graphs
- Explaining the \texttt{cumulative} propagator
- Mixed satisfiability tests for multiprocessor scheduling with release dates and deadlines.
- Jackson's pseudo-preemptive schedule and cumulative scheduling problems
- Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results
- A practical use of Jackson's preemptive schedule for solving the job shop problem
- Jackson's pseudo preemptive schedule for the \(Pm/r_i, q_i/C_{\text{max}}\) scheduling problem
- PSPLIB -- a project scheduling problem library
- Adjustment of heads and tails for the job-shop problem
- On linear lower bounds for the resource constrained project scheduling problem.
- A linear programming and constraint propagation-based lower bound for the RCPSP
- A new LP-based lower bound for the cumulative scheduling problem
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- An improved max-flow-based lower bound for minimizing maximum lateness on identical parallel machines
- Tight LP bounds for resource constrained project scheduling
- Satisfiability tests and time-bound adjustments for cumulative scheduling problems
- Constraint propagation and decomposition techniques for highly disjunctive and highly cumulative project scheduling problems
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- Une méthode arborescente pour résoudre les problèmes cumulatifs
- An Algorithm for Solving the Job-Shop Problem
- Ordonnancements. La notion de «parties obligatoires» et son application aux problèmes cumulatifs
- A Computational Study of the Job-Shop Scheduling Problem
- Complexity Results for Multiprocessor Scheduling under Resource Constraints
This page was built for publication: An efficient pseudo-polynomial algorithm for finding a lower bound on the makespan for the resource constrained project scheduling problem