Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness

From MaRDI portal
Publication:1715728

DOI10.1007/s40314-018-0694-3zbMath1413.90104OpenAlexW2890204778MaRDI QIDQ1715728

Muberra Allahverdi, Ali Allahverdi

Publication date: 29 January 2019

Published in: Computational and Applied Mathematics (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s40314-018-0694-3




Related Items (6)



Cites Work


This page was built for publication: Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness