Integrated production-delivery lot sizing model with limited production capacity and transportation cost considering overtime work and maintenance time

From MaRDI portal
Publication:1720427

DOI10.1155/2018/1569029zbMath1426.90039OpenAlexW2797828119MaRDI QIDQ1720427

Xuefang Sun, Ren-Qian Zhang

Publication date: 8 February 2019

Published in: Mathematical Problems in Engineering (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1155/2018/1569029






Cites Work




This page was built for publication: Integrated production-delivery lot sizing model with limited production capacity and transportation cost considering overtime work and maintenance time