Multiobjective order acceptance and scheduling on unrelated parallel machines with machine eligibility constraints
From MaRDI portal
Publication:1721157
DOI10.1155/2018/6024631zbMath1427.90160OpenAlexW2793037814WikidataQ130186469 ScholiaQ130186469MaRDI QIDQ1721157
Publication date: 8 February 2019
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2018/6024631
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)
Related Items (2)
Auxiliary resource planning in a flexible flow shop scheduling problem considering stage skipping ⋮ Bi-objective unrelated parallel machines scheduling problem with worker allocation and sequence dependent setup times considering machine eligibility and precedence constraints
Cites Work
- A survey on offline scheduling with rejection
- Scheduling with job rejection and nonsimultaneous machine available time on unrelated parallel machines
- List scheduling in a parallel machine environment with precedence constraints and setup times
- A Pareto-based adaptive variable neighborhood search for biobjective hybrid flow shop scheduling problem with sequence-dependent setup time
- Parallel machine scheduling with machine availability and eligibility constraints
- Flowshop-scheduling problems with makespan criterion: a review
- Unnamed Item
- Unnamed Item
This page was built for publication: Multiobjective order acceptance and scheduling on unrelated parallel machines with machine eligibility constraints