Planning of electric power systems considering virtual power plants with dispatchable loads included: an inexact two-stage stochastic linear programming model
From MaRDI portal
Publication:1721331
DOI10.1155/2018/7049329zbMath1427.90324OpenAlexW2888975455WikidataQ129320449 ScholiaQ129320449MaRDI QIDQ1721331
Changyu Zhou, Jiapei Chen, Guo He Huang
Publication date: 8 February 2019
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2018/7049329
Related Items (2)
Finding optimal load dispatch solutions by using a proposed cuckoo search algorithm ⋮ A two-stage stochastic model for maintenance and rehabilitation planning of pavements
Cites Work
- A hybrid inexact-stochastic water management model
- Practical selection of SVM parameters and noise estimation for SVM regression
- Optimization of production-distribution problem in supply chain management under stochastic and fuzzy uncertainties
- A multi-level Taguchi-factorial two-stage stochastic programming approach for characterization of parameter uncertainties and their interactions: an application to water resources management
This page was built for publication: Planning of electric power systems considering virtual power plants with dispatchable loads included: an inexact two-stage stochastic linear programming model