Safety times for multistage assembly system
From MaRDI portal
Publication:1721490
DOI10.1155/2018/8208049zbMath1427.90019OpenAlexW2900224388MaRDI QIDQ1721490
Publication date: 8 February 2019
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2018/8208049
Applications of mathematical programming (90C90) Production models (90B30) Inventory, storage, reservoirs (90B05)
Cites Work
- The multi-product newsboy problem with supplier quantity discounts and a budget constraint
- Multi-stage newsboy problem: A dynamic model.
- Multiproduct multiperiod newsvendor problem with dynamic market efforts
- Robust optimization for the newsvendor problem with discrete demand
- The distribution-free newsboy problem with multiple discounts and upgrades
- Model and algorithm for bilevel newsboy problem with fuzzy demands and discounts
- An application of bi-level newsboy problem in two substitutable items under capital cost
- The newsboy problem with resalable returns: a single period model and case study
- Planning order releases for an assembly system with random operation times
- The distribution-free newsboy problem and the demand skew
- Supply management in assembly systems
This page was built for publication: Safety times for multistage assembly system