A novel algorithm to scheduling optimization of melting-casting process in copper alloy strip production
From MaRDI portal
Publication:1723199
DOI10.1155/2015/147980zbMath1418.90125OpenAlexW2151495968WikidataQ59105307 ScholiaQ59105307MaRDI QIDQ1723199
Jianwen Guo, Xiaohui Yan, Kaishun Hu, Zhicong Zhang, Shuai Li
Publication date: 19 February 2019
Published in: Discrete Dynamics in Nature and Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2015/147980
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Uses Software
Cites Work
- A hybrid artificial bee colony optimizer by combining with life-cycle, Powell's search and crossover
- A hybrid multi-objective artificial bee colony algorithm for burdening optimization of copper strip production
- A hybrid particle swarm optimization and tabu search algorithm for order planning problems of steel factories based on the make-to-stock and make-to-order management architecture
- Solving multiobjective optimization problems using artificial bee colony algorithm
- A novel hybrid algorithm for scheduling steel-making continuous casting production
- Nonlinear multiobjective optimization
- A powerful and efficient algorithm for numerical function optimization: artificial bee colony (ABC) algorithm
- A novel evolution strategy for multiobjective optimization problem
This page was built for publication: A novel algorithm to scheduling optimization of melting-casting process in copper alloy strip production