A note on two-agent scheduling with resource dependent release times on a single machine
From MaRDI portal
Publication:1723365
DOI10.1155/2015/503297zbMath1418.90115OpenAlexW2086243499WikidataQ59105956 ScholiaQ59105956MaRDI QIDQ1723365
Publication date: 19 February 2019
Published in: Discrete Dynamics in Nature and Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2015/503297
Related Items (1)
Cites Work
- Two-agent singe-machine scheduling with release times to minimize the total weighted completion time
- Single machine scheduling problem with two synergetic agents and piece-rate maintenance
- Single machine scheduling with resource dependent release times and processing times
- Approximation algorithms for multi-agent scheduling to minimize total weighted completion time
- On minimizing resource consumption with constraints on the makespan and the total completion time
- Single-machine scheduling to minimize total convex resource consumption with a constraint on total weighted flow time
- Convex resource allocation for minimizing the makespan in a single machine with job release dates
- Two-agent single-machine scheduling with assignable due dates
- Single-machine scheduling with time-and-resource-dependent processing times
- Optimal due-date assignment problem with learning effect and resource-dependent processing times
- A multiple-criterion model for machine scheduling
- Multi-agent single machine scheduling
- Scheduling Problems with Two Competing Agents
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Resource optimal control in some single-machine scheduling problems
This page was built for publication: A note on two-agent scheduling with resource dependent release times on a single machine