Integrated berth allocation and time-variant quay crane scheduling with tidal impact in approach channel
From MaRDI portal
Publication:1727298
DOI10.1155/2018/9097047zbMath1417.90077OpenAlexW2898022001WikidataQ129090070 ScholiaQ129090070MaRDI QIDQ1727298
Xiaogang Jiao, Feifeng Zheng, Ming Liu, Yin-Feng Xu
Publication date: 20 February 2019
Published in: Discrete Dynamics in Nature and Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2018/9097047
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (1)
Cites Work
- Unnamed Item
- Optimization by Simulated Annealing
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
- A set-partitioning-based model for the berth allocation problem under time-dependent limitations
- Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals
- Berth allocation with time-dependent physical limitations on vessels
- A survey of berth allocation and quay crane scheduling problems in container terminals
- The berth planning problem
- Container terminal operation and operations research -- a classification and literature review
- A comprehensive survey on particle swarm optimization algorithm and its applications
- Transshipment of containers at a container terminal: An overview
- A scheduling method for Berth and Quay cranes
- Optimal berth allocation and time-invariant quay crane assignment in container terminals
- The Bottomn-Left Bin-Packing Heuristic: An Efficient Implementation
- A survey of simulated annealing as a tool for single and multiobjective optimization
This page was built for publication: Integrated berth allocation and time-variant quay crane scheduling with tidal impact in approach channel