A cost optimization model for multiresource leveling problem without project duration constraint
From MaRDI portal
Publication:1727483
DOI10.1155/2016/1514959zbMath1417.90091OpenAlexW2481553296WikidataQ59123386 ScholiaQ59123386MaRDI QIDQ1727483
Qian Zhang, Qingyou Yan, Xin Zou
Publication date: 20 February 2019
Published in: Discrete Dynamics in Nature and Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2016/1514959
Cites Work
- An improved ant colony optimization algorithm for nonlinear resource-leveling problems
- An exact algorithm for minimizing resource availability costs in project scheduling
- Optimal resource leveling using non-serial dynamic programming
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
- Mixed-integer linear programming for resource leveling problems
- Optimization guided lower and upper bounds for the resource investment problem
- Minimizing Resource Availability Costs in Time-Limited Project Networks
This page was built for publication: A cost optimization model for multiresource leveling problem without project duration constraint