On the strength of time-indexed formulations for the resource-constrained project scheduling problem

From MaRDI portal
Publication:1728175

DOI10.1016/j.orl.2017.02.001zbMath1409.90085OpenAlexW2587456227MaRDI QIDQ1728175

Christian Artigues

Publication date: 22 February 2019

Published in: Operations Research Letters (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.orl.2017.02.001




Related Items (18)

The sample analysis machine scheduling problem: definition and comparison of exact solving approachesOptimization Strategies for Resource-Constrained Project Scheduling Problems in Underground MiningRobust Capacity Planning for Project ManagementA polyhedral study of event-based models for the resource-constrained project scheduling problemA project scheduling problem with periodically aggregated resource-constraintsAn iterative time‐bucket refinement algorithm for a high‐resolution resource‐constrained project scheduling problemModeling frameworks for the multi‐skill resource‐constrained project scheduling problem: a theoretical and empirical comparisonAn improved decision support model for scheduling production in an engineer-to-order manufacturerA branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraintsContinuous-time formulations for multi-mode project schedulingThe multi-mode resource investment problem: a benchmark library and a computational study of lower and upper boundsMaximizing the expected net present value in a project with uncertain cash flowsAn MDD-Based Lagrangian Approach to the Multicommodity Pickup-and-Delivery TSPPolyhedral Results and Branch-and-Cut for the Resource Loading ProblemStrong bounds for resource constrained project scheduling: preprocessing and cutting planesImproved formulations and new valid inequalities for a hybrid flow shop problem with time-varying resources and chaining time-lagShort- and medium-term optimization of underground mine planning using constraint programmingA computational study of constraint programming approaches for resource-constrained project scheduling with autonomous learning effects



Cites Work




This page was built for publication: On the strength of time-indexed formulations for the resource-constrained project scheduling problem