Integrating big data analytic and hybrid firefly-chaotic simulated annealing approach for facility layout problem
DOI10.1007/s10479-016-2237-xzbMath1434.90085OpenAlexW2415285590MaRDI QIDQ1730523
Surya Prakash Singh, Akash Tayal
Publication date: 6 March 2019
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-016-2237-x
factor analysisfirefly algorithmbig data analyticsanalytical hierarchical processchaotic simulated annealingmulti-objective stochastic dynamic facility layout problem
Multi-objective and goal programming (90C29) Stochastic programming (90C15) Approximation methods and heuristics in mathematical programming (90C59) Discrete location and assignment (90B80)
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- The plant layout problem in automated manufacturing systems
- The facility layout problem
- Single and multiple period layout models for automated manufacturing systems
- Modeling uncertainties in plant layout problems
- Flexible machine layout design for dynamic and uncertain production environments
- Application of chaos in simulated annealing
- An improved heuristic approach for multi-objective facility layout problem
- Assignment Problems and the Location of Economic Activities
- Two-level modified simulated annealing based approach for solving facility layout problem
- Firefly Algorithms for Multimodal Optimization
- Multiple criteria approach to the facilities layout problem
- Fuzzy approach to the robust facility layout in uncertain production environments
- Layout design in dynamic environments: analytical issues
- Layout optimization considering production uncertainty and routing flexibility
- Multi-objective meta-heuristics: An overview of the current state-of-the-art
This page was built for publication: Integrating big data analytic and hybrid firefly-chaotic simulated annealing approach for facility layout problem