Fix-and-optimize procedures for solving the long-term unit commitment problem with pumped storages
DOI10.1007/s10479-018-2900-5zbMath1434.90047OpenAlexW2807282187WikidataQ129758651 ScholiaQ129758651MaRDI QIDQ1730713
Alexander Franz, Jürgen Zimmermann, Julia Rieck
Publication date: 6 March 2019
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-018-2900-5
unit commitment problemhydrothermal coordinationfix-and-optimize proceduremixed-integer linear programming modelpumped storagesvolatile residual demand patterns
Applications of mathematical programming (90C90) Mixed integer programming (90C11) Production models (90B30)
Related Items (1)
Uses Software
Cites Work
- Unnamed Item
- Decomposition algorithm for large-scale two-stage unit-commitment
- A fix-and-optimize heuristic for the high school timetabling problem
- A deterministic method for the unit commitment problem in power systems
- A survey of stochastic modelling approaches for liberalised electricity markets
- Unit commitment in power generation -- a basic model and some extensions
- The min-up/min-down unit commitment polytope
- Heuristic solutions to the long-term unit commitment problem with cogeneration plants
- Uncertainty in the electric power industry. Methods and models for decision support
- Large-scale unit commitment under uncertainty
- Many-to-many location-routing with inter-hub transport and multi-commodity pickup-and-delivery
- Modern Optimization Techniques with Applications in Electric Power Systems
- Scenarios and Policy Aggregation in Optimization Under Uncertainty
This page was built for publication: Fix-and-optimize procedures for solving the long-term unit commitment problem with pumped storages