Designing a framework to improve time series data of construction projects: application of a simulation model and singular spectrum analysis
From MaRDI portal
Publication:1736812
DOI10.3390/a9030045zbMath1461.90062OpenAlexW2485183746MaRDI QIDQ1736812
Seyed Hossein Iranmanesh, Ahmad Tavassoli Hojjati, Zahra Hojjati Tavassoli
Publication date: 26 March 2019
Published in: Algorithms (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3390/a9030045
project managementsingular spectrum analysisearned value managementproject progress simulationS-curve technique
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)
Uses Software
Cites Work
- Unnamed Item
- Separability and window length in singular spectrum analysis
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Common singular spectrum analysis of several time series
- PSPLIB -- a project scheduling problem library
- A simulation and evaluation of earned value metrics to forecast the project duration
- Forecasting UK Industrial Production with Multivariate Singular Spectrum Analysis
This page was built for publication: Designing a framework to improve time series data of construction projects: application of a simulation model and singular spectrum analysis