Electric vehicle routing problem with time-dependent waiting times at recharging stations

From MaRDI portal
Publication:1738821

DOI10.1016/j.cor.2019.02.014zbMath1458.90106OpenAlexW2898596225WikidataQ128284260 ScholiaQ128284260MaRDI QIDQ1738821

Merve Keskin, Gilbert Laporte, Bülent Çatay

Publication date: 18 April 2019

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: http://research.sabanciuniv.edu/34883/2/2018_Odysseus_KeskinLaporte%C3%87atay.pdf



Related Items

Coordinated routing of electric commercial vehicles with intra-route recharging and en-route battery swapping, A GRASP with penalty objective function for the green vehicle routing problem with private capacitated stations, Branch-and-cut-and-price for the electric vehicle routing problem with time windows, piecewise-linear recharging and capacitated recharging stations, A simulation-based heuristic for the electric vehicle routing problem with time windows and stochastic waiting times at recharging stations, A survey of adaptive large neighborhood search algorithms and applications, An improved matheuristic for solving the electric vehicle routing problem with time windows and synchronized mobile charging/battery swapping, A branch-cut-and-price algorithm for the time-dependent electric vehicle routing problem with time windows, Routing electric vehicles with a single recharge per route, Electric vehicles fast charger location-routing problem under ambient temperature, A large neighborhood search-based matheuristic for the load-dependent electric vehicle routing problem with time windows, A survey of attended home delivery and service problems with a focus on applications, Estimating energy consumption and charging duration of electric vehicle in multigraph, A branch-and-cut-and-price algorithm for the electric vehicle routing problem with multiple technologies, A more efficient cutting planes approach for the green vehicle routing problem with capacitated alternative fuel stations, A matheuristic for AGV scheduling with battery constraints, The green vehicle routing problem with capacitated alternative fuel stations


Uses Software


Cites Work