Two-machine flowshop scheduling in a physical examination center
From MaRDI portal
Publication:1740429
DOI10.1007/S10878-017-0233-YzbMath1416.90014OpenAlexW2772685947MaRDI QIDQ1740429
Baoqiang Fan, Jingang Zhai, Wei Xiong, Ya-Dong Wang
Publication date: 30 April 2019
Published in: Journal of Combinatorial Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10878-017-0233-y
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- Two-agent scheduling in a flowshop
- Prioritized surgery scheduling in face of surgeon tiredness and fixed off-duty period
- Patients scheduling problems with deferred deteriorated functions
- Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint
- Concurrent open shop scheduling to minimize the weighted number of tardy jobs
- A two-stage approach for surgery scheduling
- Scheduling orders for multiple product types with due date related objectives
- Optimal two- and three-stage production schedules with setup times included
- Scheduling with centralized and decentralized batching policies in concurrent open shops
- Analysis of Heuristics for Two-Machine Flow-Shop Sequencing Subject to Release Dates
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- A Polynomial Approximation Scheme for a Constrained Flow-Shop Scheduling Problem
- The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
- A 3/2-approximation algorithm for two-machine flow-shop sequencing subject to release dates.
This page was built for publication: Two-machine flowshop scheduling in a physical examination center