A list-scheduling heuristic for the short-term planning of assessment centers
From MaRDI portal
Publication:1743646
DOI10.1007/s10951-017-0521-5zbMath1392.90070OpenAlexW2610135271MaRDI QIDQ1743646
Norbert Trautmann, Adrian Zimmermann
Publication date: 13 April 2018
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-017-0521-5
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20) Economic models of real-world systems (e.g., electricity markets, etc.) (91B74)
Related Items (2)
An updated survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Preface
Cites Work
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application
- Project scheduling under limited resources. Models, methods, and applications
- A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- A comparison of list schedules for parallel processing systems
- Scheduling projects with labor constraints
This page was built for publication: A list-scheduling heuristic for the short-term planning of assessment centers