Heuristics for periodical batch job scheduling in a MapReduce computing framework
From MaRDI portal
Publication:1750408
DOI10.1016/J.INS.2015.07.040zbMath1390.68137OpenAlexW1167386377WikidataQ58201998 ScholiaQ58201998MaRDI QIDQ1750408
Rubén Ruiz, Tianze Jiang, Xiao-Ping Li
Publication date: 22 May 2018
Published in: Information Sciences (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/10251/78868
Approximation methods and heuristics in mathematical programming (90C59) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Uses Software
Cites Work
- Unnamed Item
- A two-stage hybrid flowshop with uniform machines and setup times
- A hybrid three-stage flowshop problem: Efficient heuristics to minimize makespan
- Minimizing makespan in hybrid flowshops
- Heuristic algorithms for the two-stage hybrid flowshop problem
- Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop.
- Scheduling flexible flow lines with sequence-dependent setup times
- The hybrid flow shop scheduling problem
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times
- Optimal two- and three-stage production schedules with setup times included
- Tuning an Algorithm Using Design of Experiments
- Two-Stage, Hybrid Flowshop Scheduling Problem
- Scheduling
This page was built for publication: Heuristics for periodical batch job scheduling in a MapReduce computing framework