No-wait flowshop scheduling problem with two criteria; total tardiness and makespan

From MaRDI portal
Publication:1750472

DOI10.1016/j.ejor.2017.11.070zbMath1388.90050OpenAlexW2790142786MaRDI QIDQ1750472

Harun Aydilek, Ali Allahverdi, Asiye Aydilek

Publication date: 22 May 2018

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2017.11.070




Related Items (6)



Cites Work


This page was built for publication: No-wait flowshop scheduling problem with two criteria; total tardiness and makespan