No-wait flowshop scheduling problem with two criteria; total tardiness and makespan
From MaRDI portal
Publication:1750472
DOI10.1016/j.ejor.2017.11.070zbMath1388.90050OpenAlexW2790142786MaRDI QIDQ1750472
Harun Aydilek, Ali Allahverdi, Asiye Aydilek
Publication date: 22 May 2018
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2017.11.070
Related Items (6)
An improved water wave optimization algorithm with the single wave mechanism for the no-wait flow-shop scheduling problem ⋮ Shop scheduling in manufacturing environments: a review ⋮ An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time ⋮ Intelligent optimization under the makespan constraint: rapid evaluation mechanisms based on the critical machine for the distributed flowshop group scheduling problem ⋮ No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan ⋮ No-wait two-stage flowshop problem with multi-task flexibility of the first machine
Cites Work
- Total completion time with makespan constraint in no-wait flowshops with setup times
- The third comprehensive survey on scheduling problems with setup times/costs
- Analysis of a parallel machine scheduling problem with sequence dependent setup times and job availability intervals
- NEH-based heuristics for the permutation flowshop scheduling problem to minimise total tardiness
- Some heuristics for no-wait flowshops with total tardiness criterion
- A cutting and scheduling problem in float glass manufacturing
- A novel differential evolution algorithm for bi-criteria no-wait flow shop scheduling problems
- No-wait flowshops with bicriteria of makespan and maximum lateness.
- A survey of scheduling problems with no-wait in process
- Heuristics for no-wait flowshops with makespan subject to mean completion time
- Some local search algorithms for no-wait flow-shop problem with makespan criterion
- Multicriteria scheduling problems: a survey
- Scheduling Aircraft to Reduce Controller Workload
- Minimizing total tardiness in no-wait flowshops
- New heuristics for no-wait flow shops with a linear combination of makespan and maximum lateness
- Optimal Real-Time Traffic Control in Metro Stations
- Some new results in flow shop scheduling
- Generating Experimental Data for Computational Testing with Machine Scheduling Applications
- No-wait flowshops with bicriteria of makespan and total completion time
- Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
This page was built for publication: No-wait flowshop scheduling problem with two criteria; total tardiness and makespan