A nearest neighbour extension to project duration forecasting with artificial intelligence
From MaRDI portal
Publication:1751933
DOI10.1016/j.ejor.2016.11.018zbMath1403.68247OpenAlexW2554894595MaRDI QIDQ1751933
Mathieu Wauters, Mario Vanhoucke
Publication date: 25 May 2018
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2016.11.018
Uses Software
Cites Work
- Unnamed Item
- Greedy function approximation: A gradient boosting machine.
- Bagging predictors
- Bankruptcy prediction in banks and firms via statistical and intelligent techniques -- a review
- Forecasting with cue information: a comparison of multiple regression with alternative forecasting approaches
- Measuring time. Improving project performance using earned value management
- Optimal timing of project control points
- Principal component analysis.
- Support-vector networks
- An evaluation of the adequacy of project network generators with systematically sampled networks
- Rangen: A random network generator for activity-on-the-node networks
- Developing activity duration specification limits for effective project control
- Critical-Path Planning and Scheduling: Mathematical Basis
- A simulation and evaluation of earned value metrics to forecast the project duration
- Nearest neighbor pattern classification
- Problems in the Analysis of Survey Data, and a Proposal
This page was built for publication: A nearest neighbour extension to project duration forecasting with artificial intelligence