Optimizing the open pit-to-underground mining transition
DOI10.1016/j.ejor.2016.07.021zbMath1394.90408OpenAlexW2484931705MaRDI QIDQ1752806
Marcos Goycoolea, Barry King, Alexandra M. Newman
Publication date: 24 May 2018
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2016.07.021
integer programming applications: exact and heuristic approachesmining/metals industries: optimal extraction sequenceproduction scheduling: transition problem
Applications of mathematical programming (90C90) Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30) Case-oriented studies in operations research (90B90)
Related Items (5)
Uses Software
Cites Work
- Unnamed Item
- Medium range optimization of copper extraction planning under uncertainty in future copper prices
- Optimization-based heuristics for underground mine scheduling
- Long term production planning of open pit mines by ant colony optimization
- Using aggregation to optimize long-term production planning at an underground mine
- The new Fundamental Tree Algorithm for production scheduling of open pit mines
- A hybrid heuristic algorithm for the open-pit-mining operational planning problem
- A new MIP model for mine equipment scheduling by minimizing maintenance cost
- A mathematical programming viewpoint for solving the ultimate pit problem
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
- Optimizing Long-Term Production Plans in Underground and Open-Pit Copper Mines
- Network optimization for the design of underground mines
- Solving LP Relaxations of Large-Scale Precedence Constrained Problems
- A New Algorithm for the Open-Pit Mine Production Scheduling Problem
This page was built for publication: Optimizing the open pit-to-underground mining transition