Classifying and modeling setups and cleanings in lot sizing and scheduling
From MaRDI portal
Publication:1753633
DOI10.1016/j.ejor.2017.03.023zbMath1403.90293OpenAlexW2595320201MaRDI QIDQ1753633
Bryndis Stefansdottir, Renzo Akkerman, Martin Grunow
Publication date: 29 May 2018
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2017.03.023
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Production models (90B30) Inventory, storage, reservoirs (90B05)
Related Items (4)
Minimizing the makespan on a single machine subject to modular setups ⋮ Scheduling wine bottling operations with multiple lines and sequence-dependent set-up times: robust formulation and a decomposition solution approach ⋮ Design of mathematical models for the integration of purchase and production lot-sizing and scheduling problems under demand uncertainty ⋮ A mixed-integer programming model for an integrated production planning problem with preventive maintenance in the pulp and paper industry
Cites Work
- Capacitated lot sizing with parallel machines, sequence-dependent setups, and a common setup operator
- On production planning and scheduling in food processing industry:modelling non-triangular setups andproduct decay
- Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups
- Sequencing and scheduling for filling lines in dairy production
- Optimal production scheduling for the dairy industry
- Production setup-sequencing and lot-sizing at an animal nutrition plant through ATSP subtour elimination and patching
- Planning and scheduling packaging lines in food industry
- Scheduling and lot streaming in flowshops with no-wait in process
- A survey of scheduling problems with no-wait in process
- Planning and scheduling in the process industry
- Simultaneous lotsizing and scheduling problems: a classification and review of models
- Dynamic capacitated lot-sizing problems: a classification and review of solution approaches
- The significance of reducing setup times/setup costs
- A survey of scheduling problems with setup times or costs
- A heuristic approach for two-machine no-wait flowshop scheduling with due dates and class setups
- Flowshop scheduling research after five decades
- Survey of scheduling research involving setup times
- Flowshop-scheduling problems with makespan criterion: a review
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
- Batch scheduling in the no-wait two-machine flowshop to minimize the makespan
This page was built for publication: Classifying and modeling setups and cleanings in lot sizing and scheduling