Assemble-to-order systems: a review

From MaRDI portal
Publication:1753635

DOI10.1016/j.ejor.2017.02.029zbMath1403.90278OpenAlexW2590132193MaRDI QIDQ1753635

Taher Ahmadi, Clara Stegehuis, Zümbül Atan, Ton G. de Kok, Ivo J. B. F. Adan

Publication date: 29 May 2018

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://research.tue.nl/nl/publications/0b2cf625-65b2-43cc-9c89-cca9fe84bf5f




Related Items (19)

Setting optimal planned leadtimes in configure-to-order assembly systemsRobust mechanism design and production structure for assembly systems with asymmetric cost informationEffect of timing on reliability improvement and ordering decisions in a decentralized assembly systemOptimal ordering policy for complementary components with partial backordering and emergency replenishment under spectral risk measureA novel decomposition-based method for solving general-product structure assemble-to-order systemsReducing tardy batches by \textit{seru} production: model, exact solution, cooperative coevolution solution, and insightsPush verse pull: inventory-leadtime tradeoff for managing system variabilitySynchronization in a two‐supplier assembly system: Combining a fixed lead‐time module with capacitated m<scp>ake‐to‐order</scp> productionIntegrating decisions with advance supply information in an assemble‐to‐order systemSeparable models for interconnected production-inventory systemsAnalysis of second order properties of production-inventory systems with lost salesOptimal control of a continuous-time \(W\)-configuration assemble-to-order systemOptimisation model for multi-item multi-echelon supply chains with nested multi-level productsOptimal and heuristic policies for assemble-to-order systems with different review periodsComponent allocation in make-to-stock assembly systemsThe Benefits of State Aggregation with Extreme-Point Weighting for Assemble-to-Order SystemsReplenishment decisions for complementary components with supply capacity uncertainty under the CVaR criterionOptimal control policies for an inventory system with commitment lead timePreservation of Supermodularity in Parametric Optimization: Necessary and Sufficient Conditions on Constraint Structures




Cites Work




This page was built for publication: Assemble-to-order systems: a review