Generic negotiation mechanisms with side payments -- design, analysis and application for decentralized resource-constrained multi-project scheduling problems
From MaRDI portal
Publication:1753651
DOI10.1016/j.ejor.2017.03.022zbMath1403.90334OpenAlexW2599555856MaRDI QIDQ1753651
Publication date: 29 May 2018
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2017.03.022
Decision theory (91B06) Deterministic scheduling theory in operations research (90B35) Group preferences (91B10) Auctions, bargaining, bidding and selling, and other market models (91B26)
Related Items (5)
Decentralized task coordination ⋮ Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty ⋮ A two‐layer approach for solving robust decentralized multiproject scheduling problem with multi‐skilled staff ⋮ Negotiation mechanisms for the multi-agent multi-mode resource investment problem ⋮ An updated survey of variants and extensions of the resource-constrained project scheduling problem
Uses Software
Cites Work
- Design of automated negotiation mechanisms for decentralized heterogeneous machine scheduling
- A \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project scheduling
- Negotiation-based collaborative planning between supply chains partners
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- Decentralized multi-level uncapacitated lot-sizing by automated negotiation
- Scheduling subject to resource constraints: Classification and complexity
- Project network models with discounted cash flows a guided tour through recent developments
- PSPLIB -- a project scheduling problem library
- Exact and truncated branch-and-bound procedures for resource-constrained project scheduling with discounted cash flows and general temporal constraints.
- Multiagent-based supply chain management
- A review on cost allocation methods in collaborative transportation
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints
- A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows
- Negotiation-based collaborative planning in divergent two-tier supply chains
- A decentralized model for automated multi-attribute negotiations with incomplete information and general utility functions
- Secure and efficient protocols for multiple interdependent issues negotiation
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows
- Algorithmic Game Theory
- Maximizing the net present value of a project under resource constraints using a Lagrangian relaxation based heuristic with tight upper bounds
- Constructive and blocking power in collaborative transportation
This page was built for publication: Generic negotiation mechanisms with side payments -- design, analysis and application for decentralized resource-constrained multi-project scheduling problems