A buffer control method for top-down project control
From MaRDI portal
Publication:1754043
DOI10.1016/j.ejor.2017.03.034zbMath1403.90501OpenAlexW2595308281MaRDI QIDQ1754043
Annelies Martens, Mario Vanhoucke
Publication date: 30 May 2018
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2017.03.034
Deterministic scheduling theory in operations research (90B35) Case-oriented studies in operations research (90B90)
Related Items (3)
The impact of a limited budget on the corrective action taking process ⋮ Dangers in using earned duration and other earned value metrics to measure a project's schedule performance ⋮ Using earned value management and schedule risk analysis with resource constraints for project control
Uses Software
Cites Work
- Unnamed Item
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Measuring time. Improving project performance using earned value management
- Resource-constrained project scheduling: A survey of recent developments.
- On criticality and sensitivity in activity networks
- Optimal timing of project control points
- An evaluation of the adequacy of project network generators with systematically sampled networks
- Rangen: A random network generator for activity-on-the-node networks
- Developing activity duration specification limits for effective project control
This page was built for publication: A buffer control method for top-down project control