Moments and distribution of the net present value of a serial project
From MaRDI portal
Publication:1754257
DOI10.1016/j.ejor.2017.12.039zbMath1403.90406OpenAlexW2780228864MaRDI QIDQ1754257
Publication date: 30 May 2018
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2017.12.039
project schedulingproject managementnet present valueleast cost fault detection problemNPV distribution
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)
Related Items (2)
Technical Note—On Matrix Exponential Differentiation with Application to Weighted Sum Distributions ⋮ Project scheduling under the threat of catastrophic disruption
Cites Work
- Scheduling modular projects on a bottleneck resource
- Basic properties of strong mixing conditions. A survey and some open questions
- Maximizing the net present value of a project under uncertainty
- Scheduling projects with stochastic activity duration to maximize expected net present value
- Project scheduling. A research handbook.
- Sequential testing of complex systems: a review
- Scheduling Markovian PERT networks to maximize the net present value
- Project options valuation with net present value and decision tree analysis
- Rangen: A random network generator for activity-on-the-node networks
- Project planning with alternative technologies in uncertain environments
- Efficient sequential decision-making algorithms for container inspection operations
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints
- The Impact of Contractor Behavior on the Client’s Payment-Scheduling Problem
- Application of a Technique for Research and Development Program Evaluation
- Group-Based Active Query Selection for Rapid Diagnosis in Time-Critical Situations
- Unnamed Item
- Unnamed Item
This page was built for publication: Moments and distribution of the net present value of a serial project