Optimal cyclic single crane scheduling for two parallel train oilcan repairing lines
From MaRDI portal
Publication:1761100
DOI10.1016/j.cor.2011.06.002zbMath1251.90210OpenAlexW2086960107MaRDI QIDQ1761100
Publication date: 15 November 2012
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2011.06.002
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Case-oriented studies in operations research (90B90)
Uses Software
Cites Work
- Cyclic multiple-robot scheduling with time-window constraints using a critical path approach
- The Minimum Common-Cycle Algorithm for Cyclic Scheduling of Two Material Handling Hoists with Time Window Constraints
- Single-track multi-hoist scheduling problem: a collision-free resolution based on a branch-and-bound approach
This page was built for publication: Optimal cyclic single crane scheduling for two parallel train oilcan repairing lines