Modeling and solving rich quay crane scheduling problems

From MaRDI portal
Publication:1761126

DOI10.1016/j.cor.2011.09.025zbMath1251.90163OpenAlexW1968811477MaRDI QIDQ1761126

Frank Meisel, Roberto Trunfio, Pasquale Legato

Publication date: 15 November 2012

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2011.09.025




Related Items (20)

Some complexity results and an efficient algorithm for quay crane scheduling problemA follow-up survey of berth allocation and quay crane scheduling problems in container terminalsScheduling multiple factory cranes on a common trackA reclaimer scheduling problem arising in coal stockyard managementExact methods for the quay crane scheduling problem when tasks are modeled at the single container levelAn efficient and fast local search based heuristic for reel management in a production line of oil extraction pipesCombining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vesselScheduling quay cranes and shuttle vehicles simultaneously with limited apron buffer capacityA generalized classification scheme for crane scheduling with interferenceHandling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision modelScheduling reclaimers serving a stock pad at a coal terminalScheduling quay cranes and yard trucks for unloading operations in container portsA Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraintsThe study of the unidirectional quay crane scheduling problem: complexity and risk-aversionAn effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problemAn exact algorithm for the unidirectional quay crane scheduling problem with vessel stabilityMultiple crane scheduling in a batch annealing process with no-delay constraints for machine unloadingA local branching-based algorithm for the quay crane scheduling problem under unidirectional schedulesDynamic programming algorithms for the general quay crane double-cycling problem with internal-reshufflesDouble girder bridge crane with double cycling: scheduling strategy and performance evaluation



Cites Work


This page was built for publication: Modeling and solving rich quay crane scheduling problems