Modeling and solving rich quay crane scheduling problems
From MaRDI portal
Publication:1761126
DOI10.1016/j.cor.2011.09.025zbMath1251.90163OpenAlexW1968811477MaRDI QIDQ1761126
Frank Meisel, Roberto Trunfio, Pasquale Legato
Publication date: 15 November 2012
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2011.09.025
Related Items (20)
Some complexity results and an efficient algorithm for quay crane scheduling problem ⋮ A follow-up survey of berth allocation and quay crane scheduling problems in container terminals ⋮ Scheduling multiple factory cranes on a common track ⋮ A reclaimer scheduling problem arising in coal stockyard management ⋮ Exact methods for the quay crane scheduling problem when tasks are modeled at the single container level ⋮ An efficient and fast local search based heuristic for reel management in a production line of oil extraction pipes ⋮ Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel ⋮ Scheduling quay cranes and shuttle vehicles simultaneously with limited apron buffer capacity ⋮ A generalized classification scheme for crane scheduling with interference ⋮ Handling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision model ⋮ Scheduling reclaimers serving a stock pad at a coal terminal ⋮ Scheduling quay cranes and yard trucks for unloading operations in container ports ⋮ A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints ⋮ The study of the unidirectional quay crane scheduling problem: complexity and risk-aversion ⋮ An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem ⋮ An exact algorithm for the unidirectional quay crane scheduling problem with vessel stability ⋮ Multiple crane scheduling in a batch annealing process with no-delay constraints for machine unloading ⋮ A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules ⋮ Dynamic programming algorithms for the general quay crane double-cycling problem with internal-reshuffles ⋮ Double girder bridge crane with double cycling: scheduling strategy and performance evaluation
Cites Work
- Unnamed Item
- A tabu search heuristic for the quay crane scheduling problem
- Simulation-based optimization for discharge/loading operations at a maritime container terminal
- A survey of berth allocation and quay crane scheduling problems in container terminals
- Exact and approximation algorithms for makespan minimization on unrelated parallel machines
- Container terminal operation and operations research -- a classification and literature review
- A crane scheduling method for port container terminals
- A fast heuristic for quay crane scheduling with interference constraints
- Operations research at container terminals: a literature update
- The quay crane scheduling problem with time windows
- Crane scheduling with spatial constraints
- A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
- Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
- Crane scheduling with non-crossing constraint
- Duality-Based Algorithms for Scheduling Unrelated Parallel Machines
- A m‐parallel crane scheduling problem with a non‐crossing constraint
This page was built for publication: Modeling and solving rich quay crane scheduling problems