A multiobjective metaheuristic for a mean-risk multistage capacity investment problem with process flexibility
From MaRDI portal
Publication:1762051
DOI10.1016/j.cor.2010.08.015zbMath1251.91054OpenAlexW1983545151MaRDI QIDQ1762051
João Claro, Jorge Pinho de Sousa
Publication date: 15 November 2012
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2010.08.015
stochastic integer programmingmean-riskprocess flexibilitymultiobjective metaheuristicsmultistage capacity investment
Lua error in Module:PublicationMSCList at line 37: attempt to index local 'msc_result' (a nil value).
Related Items (6)
Recursive risk measures under regime switching applied to portfolio selection ⋮ Conditional value‐at‐risk beyond finance: a survey ⋮ Variable neighbourhood search: methods and applications ⋮ Long-term resource planning in the high-tech industry: capacity or inventory? ⋮ Variable neighbourhood search: Methods and applications ⋮ Multi-stage stochastic model in portfolio selection problem
Uses Software
Cites Work
- Unnamed Item
- A multi-stage stochastic integer programming approach for capacity expansion under uncertainty
- A review of manufacturing flexibility
- A multiobjective metaheuristic for a mean-risk multistage capacity investment problem
- Investment Strategies for Flexible Resources
- The Value of Multistage Stochastic Programming in Capacity Planning Under Uncertainty
- Risk Mitigation in Newsvendor Networks: Resource Diversification, Flexibility, Sharing, and Hedging
- Optimal Investment in Product-Flexible Manufacturing Capacity
- An Approximation Scheme for Stochastic Integer Programs Arising in Capacity Expansion
- Manufacturing flexibility: A literature review
- The Flexibility of Production Processes: A General Framework
- Dynamic Capacity Expansion Problem with Multiple Products: Technology Selection and Timing of Capacity Additions
- A scenario-based stochastic programming approach for technology and capacity planning
This page was built for publication: A multiobjective metaheuristic for a mean-risk multistage capacity investment problem with process flexibility