An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem
From MaRDI portal
Publication:1762055
DOI10.1016/j.cor.2011.07.010zbMath1251.90140OpenAlexW2037993354MaRDI QIDQ1762055
Publication date: 15 November 2012
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2011.07.010
resource-constrained project schedulingcombined local searchshuffled frog-leaping algorithmdesign-of-experimentresource-based crossoverspeed-up evaluation
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)
Related Items
A diversified shuffled frog leaping: an application for parameter identification ⋮ Multi-mode resource availability cost problem with recruitment and release dates for resources ⋮ Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation ⋮ A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling ⋮ An Improved Genetic Algorithm for the Resource-Constrained Project Scheduling Problem ⋮ Unnamed Item ⋮ Multimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedure ⋮ A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags ⋮ A survey of hybrid metaheuristics for the resource-constrained project scheduling problem ⋮ Minimizing total weighted late work in the resource-constrained project scheduling problem ⋮ On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- A neurogenetic approach for the resource-constrained project scheduling problem
- A random key based genetic algorithm for the resource constrained project scheduling problem
- Scheduling subject to resource constraints: Classification and complexity
- An iterative scheduling technique for resource-constrained project scheduling
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
- PSPLIB -- a project scheduling problem library
- Insertion techniques for static and dynamic resource-constrained project scheduling.
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- Tabu search in audit scheduling
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling
- Project scheduling under limited resources. Models, methods, and applications
- A hybrid genetic algorithm for the resource-constrained project scheduling problem
- Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
- Solving a bi-criteria permutation flow-shop problem using shuffled frog-leaping algorithm
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
- Scheduling of Project Networks by Job Assignment
- A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem
- An investigation into the relationship of heuristic performance with network-resource characteristics
- A simulated annealing algorithm for resource constrained project scheduling problems
- Case-based reasoning and improved adaptive search for project scheduling
- Project scheduling with time-varying resource constraints
- A self-adapting genetic algorithm for project scheduling under resource constraints
- Adaptive search for solving hard project scheduling problems
- A robust genetic algorithm for resource allocation in project scheduling