Mathematical models for preemptive shop scheduling problems
From MaRDI portal
Publication:1762150
DOI10.1016/j.cor.2011.09.013zbMath1251.90138OpenAlexW2047619314MaRDI QIDQ1762150
Publication date: 15 November 2012
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2011.09.013
Related Items (2)
Two-machine flow shop scheduling problem with blocking, multi-task flexibility of the first machine, and preemption ⋮ Logic-based Benders decomposition for the preemptive flexible job-shop scheduling problem
Cites Work
- Unnamed Item
- Unnamed Item
- Preemptive job-shop scheduling problems with a fixed number of jobs
- Two models for a family of flowshop sequencing problems
- A branch and bound to minimize the number of late jobs on a single machine with release time constraints
- NP-hardness of shop-scheduling problems with three jobs
- Mixed binary integer programming formulations for the reentrant job shop scheduling problem
- Two MILP models for the N × M SDST flowshop sequencing problem
- On the Development of a Mixed-Integer Linear Programming Model for the Flowshop Sequencing Problem
- An Improved Formulation for the Job-Shop Scheduling Problem
- Dynamic models of production with multiple operations and general processing times
- The Schedule-Sequencing Problem
- Optimal scheduling for flexible job shop operation
- Scheduling
- Tighter bounds on preemptive job shop scheduling with two machines
This page was built for publication: Mathematical models for preemptive shop scheduling problems