Two-stage hybrid flow shop scheduling with dynamic job arrivals

From MaRDI portal
Publication:1762160

DOI10.1016/j.cor.2011.10.006zbMath1251.90203OpenAlexW1996628037MaRDI QIDQ1762160

Mei Zhao, Frank S. Yao, Hui Zhang

Publication date: 15 November 2012

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2011.10.006




Related Items (3)



Cites Work




This page was built for publication: Two-stage hybrid flow shop scheduling with dynamic job arrivals