Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

A note on ``The general lotsizing and scheduling problem

From MaRDI portal
Publication:1764206
Jump to:navigation, search

DOI10.1007/s00291-004-0181-7zbMath1176.90224OpenAlexW1969830983MaRDI QIDQ1764206

Haldun Süral, Ayşe Koçlar

Publication date: 24 February 2005

Published in: OR Spectrum (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s00291-004-0181-7

zbMATH Keywords

SchedulingLotsizingSequence dependent setup costs


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Inventory, storage, reservoirs (90B05)


Related Items

Simultaneous lotsizing and scheduling problems: a classification and review of models, New integer optimization models and an approximate dynamic programming algorithm for the lot-sizing and scheduling problem with sequence-dependent setups, Simultaneous lotsizing and scheduling considering secondary resources: a general model, literature review and classification


Uses Software

  • LINDO


Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1764206&oldid=14103395"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 1 February 2024, at 08:17.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki