A new heuristic for \(m\)-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness
From MaRDI portal
Publication:1765532
DOI10.1016/S0305-0548(02)00143-0zbMath1087.90025OpenAlexW2072884373MaRDI QIDQ1765532
Publication date: 23 February 2005
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0305-0548(02)00143-0
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)
Related Items (11)
Mixed binary integer programming formulations for the flow shop scheduling problems. A case study: ISD projects scheduling ⋮ A multi-agent system for integrated scheduling and maintenance planning of the flexible job shop ⋮ Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problem ⋮ A bicriteria flowshop scheduling with a learning effect ⋮ Scheduling at coal handling facilities using simulated annealing ⋮ Minimizing the bicriteria of makespan and maximum tardiness with an upper bound on maximum tardiness ⋮ Setting a common due date in a constrained flowshop: a variable neighbourhood search approach ⋮ A new heuristic for the flowshop scheduling problem to minimize makespan and maximum tardiness ⋮ Flowshop-scheduling problems with makespan criterion: a review ⋮ New solution methods for single machine bicriteria scheduling problem: Minimization of average flowtime and number of tardy jobs ⋮ Empirically discovering dominance relations for scheduling problems using an evolutionary algorithm
Cites Work
- Unnamed Item
- Minimizing makespan for flow shop scheduling by combining simulated annealing with sequencing knowledge
- Minimizing total tardiness in permutation flowshops
- Multiple and bicriteria scheduling: A literature survey
- Job lateness in a two-machine flowshop with setup times separated
- An efficient heuristic for scheduling in a flowshop to minimize total weighted flowtime of jobs
- A hybrid three-stage flowshop problem: Efficient heuristics to minimize makespan
- Tabu search for total tardiness minimization in flowshop scheduling problems
- A heuristic algorithm for mean flowtime objective in flowshop scheduling
- Heuristic procedures for minimizing makespan and the number of required pallets
- Note—Sequencing n Jobs on m Machines to Minimise Maximum Tardiness: A Branch-and-Bound Solution
- Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns
- Heuristics for Flowshop Scheduling Problems Minimizing Mean Tardiness
This page was built for publication: A new heuristic for \(m\)-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness