Scheduling under machine breakdown in a continuous process industry
From MaRDI portal
Publication:1765549
DOI10.1016/S0305-0548(02)00224-1zbMath1057.90020OpenAlexW1974626039MaRDI QIDQ1765549
Publication date: 23 February 2005
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0305-0548(02)00224-1
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- Scheduling in stochastic flowshops with independent setup, processing and removal times
- Match-up scheduling under a machine breakdown
- Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
- Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs
- A Branch-and-Bound Algorithm for Two-Stage Production-Sequencing Problems
- Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns
- Minimum Change-Over Scheduling of Several Products on One Machine
This page was built for publication: Scheduling under machine breakdown in a continuous process industry