A heuristic to schedule flexible job-shop in a glass factory

From MaRDI portal
Publication:1772853

DOI10.1016/j.ejor.2004.04.020zbMath1066.90538OpenAlexW1969697910MaRDI QIDQ1772853

Xianqiang Yang

Publication date: 21 April 2005

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2004.04.020




Related Items (13)




Cites Work




This page was built for publication: A heuristic to schedule flexible job-shop in a glass factory