Group scheduling with controllable setup and processing times: minimizing total weighted completion time

From MaRDI portal
Publication:1772970

DOI10.1007/s10479-004-5030-1zbMath1119.90020OpenAlexW2012581545MaRDI QIDQ1772970

Xianqiang Yang

Publication date: 22 April 2005

Published in: Annals of Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s10479-004-5030-1




Related Items

A survey of scheduling with controllable processing timesControllable processing times in project and production management: analysing the trade-off between processing times and the amount of resourcesSingle machine scheduling problem with controllable processing times and resource dependent release timesSingle machine quadratic penalty function scheduling with deteriorating jobs and group technologyOptimal control strategies for single-machine family scheduling with sequence-dependent batch setup and controllable processing timesScheduling to Maximize the Number of Just-in-Time Jobs: A SurveyA bicriteria approach to minimize the total weighted number of tardy jobs with convex controllable processing times and assignable due datesSingle machine group scheduling with time and position dependent processing timesGroup sequencing around a common due dateSingle-machine group scheduling problems with deterioration considerationA survey of scheduling problems with setup times or costsSingle-machine scheduling with machine unavailability periods and resource dependent processing timesBicriterion scheduling with a negotiable common due window and resource-dependent processing timesJust-in-time scheduling with controllable processing times on parallel machinesA unified approach for scheduling with convex resource consumption functions using positional penaltiesOptimal due date assignment and resource allocation in a group technology scheduling environmentSingle machine scheduling problem with multiple due windows assignment in a group technology



Cites Work