An experimental analysis of solution performance in a resource sharing and scheduling problem
From MaRDI portal
Publication:1776960
DOI10.1016/j.ejor.2003.12.020zbMath1112.90339OpenAlexW2026500181MaRDI QIDQ1776960
Subhashish Samaddar, Guoqiang Peter Zhang, Gadi Rabinowitz
Publication date: 12 May 2005
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2003.12.020
Deterministic scheduling theory in operations research (90B35) Production models (90B30) Case-oriented studies in operations research (90B90)
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- Control of a production system with variable yield and random demand
- Solving a large-scale industrial scheduling problem using MILP combined with a heuristic procedure
- Dimensions of manufacturing automation
- Models of flexible manufacturing systems with limited local buffers
- The optimal design of flexible manufacturing systems
- Two level heuristic for the resource constrained scheduling problem
- Hierarchical Production Planning: A Single Stage System
- Analytical Evaluation of Hierarchical Planning Systems
- Quasi-Static Assembly of Compliantly Supported Rigid Parts
- Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Technical Note—Single Machine Scheduling with Controllable Processing Times and Number of Jobs Tardy
- An Efficient Algorithm for Multi-Item Scheduling
This page was built for publication: An experimental analysis of solution performance in a resource sharing and scheduling problem