A two-bottleneck system with binomial yields and rigid demand
From MaRDI portal
Publication:1776968
DOI10.1016/j.ejor.2003.06.044zbMath1112.90347OpenAlexW2016899954MaRDI QIDQ1776968
Publication date: 12 May 2005
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2003.06.044
Related Items (4)
A newsvendor analysis of a binomial yield production process ⋮ Serial production systems with random yield and rigid demand: a heuristic ⋮ Inventory models for imperfect production and inspection processes with various inspection options under one-time and continuous improvement investment ⋮ Lot-sizing two-echelon assembly systems with random yields and rigid demand
Cites Work
- Unnamed Item
- Production to order on a two machine line with random yields and rigid demand
- Single bottleneck systems with proportional expected yields and rigid demand
- Multiple lotsizing in production to order with random yields: review of recent advances
- Multistage Production to Order with Rework Capability
- Optimal reject allowance with constant marginal production efficiency
- A Single Bottleneck System with Binomial Yields and Rigid Demand
- Multistage production systems with random yield: heuristics and optimality
- Lot Sizing with Random Yields: A Review
- Random Yield, Rework and Scrap in a Multistage Batch Manufacturing Environment
This page was built for publication: A two-bottleneck system with binomial yields and rigid demand