A shortest-path algorithm for solving the fleet management problem in underground mines
From MaRDI portal
Publication:1780759
DOI10.1016/J.EJOR.2004.03.008zbMath1064.90017OpenAlexW2054796629MaRDI QIDQ1780759
Paul Cohen, Michel Gamache, Renaud Grimard
Publication date: 13 June 2005
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2004.03.008
Programming involving graphs or networks (90C35) Deterministic scheduling theory in operations research (90B35) Discrete location and assignment (90B80)
Related Items (5)
Machine scheduling in underground mining: an application in the potash industry ⋮ Underground mine scheduling of mobile machines using constraint programming and large neighborhood search ⋮ Staff and machine shift scheduling in a German potash mine ⋮ A shortest-path algorithm for solving the fleet management problem in underground mines ⋮ An enumeration algorithm for solving the fleet management problem in underground mines
Cites Work
This page was built for publication: A shortest-path algorithm for solving the fleet management problem in underground mines