Scheduling reclaimer operations in the stockyard to minimize makespan
From MaRDI portal
Publication:1782041
DOI10.1007/s10255-018-0758-6zbMath1401.90085OpenAlexW2886843308WikidataQ129382571 ScholiaQ129382571MaRDI QIDQ1782041
Chao Wang, Xi-wen Lu, R. A. Sitters
Publication date: 18 September 2018
Published in: Acta Mathematicae Applicatae Sinica. English Series (Search for Journal in Brave)
Full work available at URL: https://research.vu.nl/ws/files/120340186/Wang2018_SchedulingReclaimerOperationsInTheStockyardToMinimizeMakespan.pdf
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Cites Work
- Unnamed Item
- A reclaimer scheduling problem arising in coal stockyard management
- Crane scheduling in container yards with inter-crane interference
- A note on graph balancing problems with restrictions
- Approximation schemes for scheduling on parallel machines
- A branch and price algorithm to solve the integrated production planning and scheduling in bulk ports
- A branch-and-price algorithm to solve the integrated berth allocation and yard assignment problem in bulk ports
- Graph balancing: a special case of scheduling unrelated parallel machines
- `` Strong NP-Completeness Results
- Heuristic algorithms for routing yard-side equipment for minimizing loading times in container terminals
- Approximation of Optimal Moving Paths of Huge Robot Reclaimer with a 3D Range Finder